St Paul's Church, Tai Tapu, Canterbury
Problem: The timber floor of this delightful country, church was out of level and unstable because the subfloor was not connected to the foundations.
Solution: To re-level the timber floors of the church by jacking and packing and the installation of a steel bracket for the timber floor to be connected to.